SITC of 36 NOS SUBMERSIBLE PUMPS AT MBPT SITE
BANDRA IPS: A SUCCESS STORY.
GHATKOPAR METER WORKSHOP BULK WATER METER TEST SETUP: A SUCCESS STORY.
BHANDARWADA HILL RESERVOIR PUMP REFURBISHMENT PROJECT: A SUCCESSSTORY
VEMC is the APOEM (Authorized Pumpset Original Equipment Manufacturer) of KBL (Kirloskar Brothers Ltd)
Safeguarding a high rise building with an automated fire panel
Successful installation of solar plant in a commercial building in Sion
How VEMC Solved A Case of Space Constraint for Solar Installation in a High Rise Building
Success Story: The Case of Cadbury Mondelez
Successful installation of solar plant in the heart of Panvel city
Corrocoating of KBL Split Case Pumps at MCGM Golanji Hill Reservoir
Replacement of Pumpset and Control Panel near Rawli Camp
Valve replacement matunga
Panjrapur pump replacement
Taj Hotel
MCGM Bhandup Complex Corrocoat